Soil Stabilizer

MST-10 soil stabilizer is a high concentration, liquid, water-based solution. Milestone® is a professional manufacturer of soil stabilizers, providing customized engineering solutions according to different projects.

Soil stabilization works show

Traditional Road Construction Challenges

Traditional soil - based road construction has many drawbacks. It relies on costly graded crushed stone and has time - consuming processes and specialized equipment requirements. Sourcing and transporting materials also have a big environmental impact. Compared with traditional ways , MST-10 soil stabilizer is an new soil stabilization.

MST - 10 soil stabilizer changes soil stabilization. It uses locally available clay - based materials, reducing material and transportation costs and the carbon footprint. It improves soil density, CBR values, and reduces porosity, making roads stronger and more durable in various conditions.

MST-10 soil stabilizer

Advantages of MST - 10

soil stabilizer reduces construction costs by using on - site soil. It enables faster construction without extensive preparation and multiple material layers. The simple process, using conventional equipment with minimal training, saves time and labor. Environmentally, it cuts non - renewable resource use and transportation needs. The roads need less maintenance and produce less dust.

Product performance:

Color

white

Odor

characteristic odor

pH

5-7

Melting point/range

0°C wate

Evaporation Rate (Butyl Acetate = 1)

<1 water

Vapor pressure

Approx.17 mmHg at 20 °C Wate

Water solubility

partly miscible

Dynamic viscosity

Approx. 1100-1500 mPa.s (Brookfield DC-II+, S3/100rpm, 23±3°C)

Solid content

56 wt% (heat loss method @ 105°C


Applications

MST - 10 soil stabilizer is versatile. In mining, it handles heavy machinery traffic. On construction sites, it quickly creates temporary access roads. In rural areas, it builds durable roads, boosting local economies.

Solid stabilizer construction road application


Contact us to quote:

Mail: helen@milestonecn.com

Tel/Whatsapp:+86 18630661160


Usage Instructions

MST - 10 is a concentrated liquid specialized for soil stabilization . Application rate depends on soil conditions. Steps prepare the soil by removing debris and loosening it; mix the stabilizer thoroughly with the soil; compact the treated soil; cure it for 3-7 days, restricting heavy traffic and avoiding excessive water.

use of soil stabilizers

Customer Success Stories

Many projects have used MST - 10 for soil stabilization successfully. A mining company cut road maintenance costs and reduced construction time by 40%. A rural community project built durable roads within budget, improving accessibility.

Application effect of soil stabilizer

Application Scenarios

1.Full running roads; 

2.Sub base stabilization; 

3.Non-traffic dust & erosion control; 

4.Mine haul roads and tailings; 

5.Parking lots 

6.Golf courses; 

7.Solar sites; 

8.Runways and helipads;

9.Military roads; 

10.Landfill cover;

11.Golf bunker lining; 

12.Farm access roads;

13.Pothole repairs; 

14.Erosion & dust control for road shoulders;

15.Erosion & dust control for slopes.

MST - 10 soil stabilizer is an innovative solution for soil stabilization, offering a cost - effective, efficient, and environmentally friendly approach to road construction. It's suitable for various projects, providing excellent performance and practicality.

Send Inquiry

Product Performance

01

Water based material, the liquid is neutral and will not corrode the spraying machinery.

02

It does not contain heavy metals, organic halogen compounds, petroleum by-products, organic solvents, inorganic salt compounds, and has no harm to the human body.

03

Widely applicable to soil, using locally sourced materials for road construction, saving a large amount of crushed (gravel) materials, reducing transportation costs, and shortening the road construction period.

04

After drying and forming a film, it will no longer dissolve in water or be damaged by water.

05

Simple equipment operation and low investment.

06

Once used, it can reduce common maintenance issues such as erosion, ruts, bumps, potholes, and dust on the road.

FREQUENTLY ASKED QUESTION

  • What is the weight capacity of each tote?
    Each tote can load approximately 1 ton. Meanwhile customized packaging of other specifications are available according to the different needs of our customers.
  • How can I request a sample for quality assessment?
    To request a sample for quality assessment, please contact our sales team. We can provide 2kg sample for testing at no charge. However, the shipping cost will be the responsibility for the buyer.
  • What are the recommended layer thicknesses for different road conditions?
    We recommend to build as the depth of 20 centimeters for normal traffic. For roads that experience heavy vehicle traffic, to build as the depth of 30 centimeters is more suitable.
  • How should I handle the product during inclement weather?
    It is crucial to avoid exposure to rain within 8 hours after construction. Once the road has set, it possesses excellent waterproof properties and will not be eroded by rain.
  • How can I track my order or get updates on its status?
    You can track your order and receive updates through our customer portal or by contacting our logistics team directly. We prioritize transparency and keep our customers informed throughout the shipping process.
  • What happens if the product does not meet my expectations after testing?
    If the product does not meet your expectations after testing, we encourage you to reach out to our customer service team. We will work with you to find the issues and make a solution that meets your requirements.
  • Do you offer any training or guidance on the application of our products?
    We provide comprehensive training materials and can arrange for online guidence or on-site training session to ensure your team is well-versed in the application of our products.
  • What is the lead time for sample delivery?
    The lead time for sample delivery is typically within two weeks. This allows us to ensure that you receive the sample of latest production date and possible for accurate testing.
  • Will you provide on-site technical support for the initial projects?
    Yes, we can arrange a technician for on-site guidence. However, clients will need to cover the technician's travel expenses and there will be a daily consulting fee.
  • Is it possible to secure exclusive distribution rights for my region?
    While we do not issue letters of exclusivity until an order is placed, we can discuss the possibility of exclusive rights. To maintain exclusivity, a certain number of containers must be ordered per year. We are flexible during the first year, understanding that it can be the most challenging.
  • Where can I find more information about your company and manufacturing locations?
    Milestone Mineral Co., Ltd is a China registered company with its headquarters in Hebei Province. We operate factories and warehouses in both Hebei and Shandong Provinces.
  • What is the storage condition for our products to maintain its quality?
    The products should be stored away from direct sunlight and in temperatures ranging from 5℃ to 40℃ to ensure its two-year shelf life.